


Al Areen Project
Water Supply Facilities FOE Al Areen and Al Salam Developments and Capacity enhancements at Hamad Town Blending and Distribution Stations.
Instrumentation & process Control Maintenance
Electricity and Water Authority. Instrumentation & process Control Maintenance.
Al Dur Project
New Aldur FS, Storage tank & Modification works AT WEST RIFFA II BS & Refinery DS.
Tatweer Projects –Oil And Gas
Steam Rubble Phase –I < MGI-New 10” Header Mechanical Construction.
Provision of Operation and Preventive Planed maintenance (PPM) WTD
Hidd & Salmabad pumping Stations.
Chlorination Control Systems For Pumping Station
Al Areen and Al Salaam Developments and Capacity Enhancements at Hamad Town Blending & Distribution Stations.
BASF Project
Supply, Installation and Commissioning Support for PLC panels, Remote IO Panels and Valve Island Panels.
Al Areen Project
PROJECT NAME: WATER SUPPLY FACILITIES FOE AL AREEN AND AL SALAAM DEVELOPMENTS AND CAPACITY ENHANCEMENTS AT HAMAD TOWN BLENDING AND DISTRIBUTION STATIONS.
PACKAGE-1 WORKS: PUMPING STATION WORKS AT WEST RIFFA'A BS, HAMAD TOWN BS, HAMAD TOWN DS AND AL AREEN BS
PACKAGE-2 WORKS: PUMPING STATION WORKS AT SAMAHIJ DS, AD DUR FS AND REFINERY DS
CLIENT: ELECTRICITY AND WATER AUTHORITY – KINGDOM OF BAHRAIN.
CONSULTANTS: HYDER CONSULTING MIDDLE EAST LIMITED
ICA SCOPE OF WORK: ENGINEERING, DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISIONING OF INSTRUMENTS, CONTROLS, SCADA, TELECOMMUNICATION INTERFACE AND ALL PROCESS MONITORING FOR PUMPING STATION AND ITS ASSOCIATED ANCILLARIES.
DESCRIPTION OF WORK: THE INSTRUMENTATION AND CONTROL AUTOMATION WORKS FOR THE SEVEN WATER STATIONS WHICH INCLUDES THE PLC/SCADA SYSTEM, INSTRUMENTS SUPPLY, INSTALLATION, COMMISIONING FOR PROCESS CONTROL, MONITORING AND SAFETY IN ORDER TO OPERATE THE STATION AUTOMATICALLY HOWEVER APPLICABLE, VIBRATION & TEMPERATUR MONITORING SYSTEM FOR MONITORING VARIOUS REAL-TIME PROCESS RELATED VALUES OF PUMPS, ALL REAL TIME PROCESS RELATED DATA'S LIKE TANK LEVELS, ESR LEVEL, FLOW RATES, PIPE LINE PRESSURE READINGS, ETC WILL BE AVAILABLE ON THE OPERATING STATIONS, MINIMISING THE NEED FOR SITE WALK ROUNDS. THE IEC-101 REMOTE TERMINAL UNIT PROVIDES THE COMMUNICATION BETWEEN THE ALL THE SEVEN STATIONS AND THE SYSTEM CONTROL CENTRE (SCC) HIGH QUALITY DEDICATED OPTICAL LINKS (FIBRE OPTIC CABLS). AUTOMATIC CONTROL WITH LOCAL SUPERVISION FROM THE STATION SCADA WILL BE THE NORMAL MODE OF OPERATION. WHEN SCC IS SELECTED, THE STATION PLC/SCADA SYSTEM WILL ACCEPT THE COMMANDS/ SET POINTS ETC FROM SCC.
PRINCIPALS/SUBCONTRACTORS: ABB & AREVA.